The UETCL substation project in Uganda is a major power infrastructure project, primarily involving the supply of tools, instruments, and equipment for the 132 kV LOT2/LOT3 substation. Our company is fully responsible for all equipment, technical documentation, specialized tools, accompanying spare parts, personnel training and technical coordination, technical services and guidance, and equipment transportation, striving to provide the best possible service and after-sales support.
The Indonesia Bato Lajaga 2×150 MW (net output) pithead coal-fired power project is designed to enhance the region’s energy supply. As part of the project, the seller will provide the buyer with 34 sets of electrical testing materials. These materials are essential for performing critical electrical tests, ensuring the plant’s systems are operating at optimal efficiency and meet safety standards. The testing process will help guarantee reliable and sustainable power generation for the long term.
The Uganda Rural Electrification Transmission and Distribution System Project aims to expand and improve the country’s rural power grid. This initiative involves the construction and upgrading of transmission lines, substations, and distribution networks to increase electricity access in rural areas. The project will enhance power reliability and improve the quality of life for communities by providing consistent, affordable electricity to underserved regions.
Major Equipment Supply:
Major Equipment Supply:
Pakistan’s Karot Hydropower Project is the first hydropower project along the China-Pakistan Economic Corridor. The project has an installed capacity of 720,000 kilowatts. Not only will it improve the reliability and efficiency of local power supply, it will also promote economic development by providing cheap power while helping Pakistan transition to a greener energy structure. Meet the electricity needs of 5 million people and reduce carbon emissions by 3.5 million tons.
Major Equipment Supply:
Major Equipment Supply:
Major Equipment Supply:
The Ashuganj 400MW combined cycle gas turbine power station project in Bangladesh not only meets the growing energy demand but also enhances national energy security by improving power supply reliability and efficiency. Advanced technology reduces fuel consumption and carbon emissions. In addition, the project creates a large number of job opportunities during construction and operation, promotes regional economic growth, and is conducive to improving local infrastructure.
Major Equipment Supply:
The Malé Island gridded high-voltage transmission system project in the Maldives is the country’s first high-voltage power grid project and will be fully operational in July 2021. The commissioning of the project has enabled power interconnection among the three islands in the Male region, improved the region’s power supply capacity and reliability, and is of epoch-making significance for the construction of the Maldives power grid.
Major Equipment Supply:
Major Equipment Supply:
Major Equipment Supply:
It has greatly alleviated the power shortage problem in surrounding areas, improved the stability of Pakistan’s national power grid, and provided energy security to promote Pakistan’s economic and social development and China’s “Belt and Road” construction.
Major Equipment Supply:
Major Equipment Supply: